• Lipp steel silo systemBAIRONG Lipp steel silo system - Best solution for the grain storage silo, cement storage silo and water treatment system
  • Bulk bolted storage silo systemBAIRONG Bolt bulk storage silo system - Best solution of the bulk grain storage, bulk cement storage system
  • Lipp silo forming machineBAIRONG Lipp silo forming machine, Best solution for the lipp silo making machine, spiral steel silo making equipment
  • 1
  • 2
  • 3
Tel: 86-18610 0838 68
Fax: 86-371-6871 6761
Email:tanjie@spiral-silo.com
         kingreal2004@gmail.com
Address: NO1, Renmin Road, Anyang City 455000, Henan Province, China PR

HOME >> NEWS >>Accessories and the installation for Lipp Storage Silo

Steel body, including what library database and various accessory attachment installation steps.

1, the filter assembly

First seal sealant fixed in cement silo and dust converge on the upper margin of the flange, and then packed filter assembly has been fixed on the flange.

2, the library body lifting

Select the appropriate body under the tonnage library lifting equipment, according to the position and orientation of the screw conveyor ladder exports will position the body and legs with bolts of convergence, using theodolite straight degrees (should be less than equal to one thousandth), adjusted after tightening all the bolts. Device holder ladder.

3, device stand ladder and ladder rails. The ladder rails by welding No. warehouse body in order from top to bottom placed, bolted good, the top of the fence in the center of the two, plug in the warehouse roof opposite the ladder, the remaining two tied on a small fence, etc. after the warehouse body lifting, then devices.

4, the library body leg assembly

The ash library legs assembled, ash library is divided into two legs Parting welded cement silo dust and cement silo bunker weld number on the floor, the first library precipitator ash and cement silo bunker No. No. 4 flat on the ground, aligned up and down, left and right width based on five short convergence after the angle, even on long angle. Then the other two legs of the same assembled. After a put during the convergence angle, with a crane hanging map SC Series powder warehouse layout with another piece, the two makes up the bracket. Focus on short ladder orientation angle and the length of the ladder convergence hole azimuth angle direction together, and the length of the hole ladder convergence angle Steel common direction, (emphasis ladder position, a short length of angle iron ladder convergence angle and direction of the hole together, then do not tighten all the bolts convergence) bolt not tightened)

5, steel base bracket assembly Will be assembled by hoisting the diagonal and four-legged school level and straightness happened, after the good channel devices with embedded pieces of good welding. 

 


Copyright © 2010-2015 Zhengzhou Bairong Machinery CO., Ltd All rights reserved.
Address: NO1, Renmin Road, Anyang City 455000, Henan Province, China PR
Email: tanjie@spiral-silo.com kingreal2004@gmail.com
Tel:86-1861 0083 868