First, the cement silo consists of:
Cement silo (cement tank) by the following components: steel warehouse body parts, ladders, rails, feeding tube, filter, pressure relief valve, high and low level gauge, discharge valves, etc.
Second, the cement silo (cement tank) structure:
Cement silo is a cylindrical structure, the bottom of the tube by four legs to support the entire warehouse body, the whole warehouse full of steel forms, welded; top with filter and pressure relief valve.
Third, the cement silo (cement tank) works:
1, when the cement silo (cement tank) work must be performed by a dedicated crane to erect, and then put the pre prefabricated concrete foundation, and check the cement silo (cement tank) erected after the vertical and the horizontal degree and then at the bottom of the base is firmly embedded welding.
2, storage silos fixed later by the bulk cement truck transporting cement to the site, and then bulk cement truck transport pipe and cement silo (cement tank) feed piped through bulk cement truck's gas pressure will transported to the cement silo tank cement (cement tank) inside.
3, in the process of transporting cement to the storage silo, the operator must press the dust vibration motor uninterrupted button, shake off the dust bag attached to the cement, preventing blocked bags, warehouse explosion occurred.
4, once blocked the bag, the pressure within the compartment pressure exceeds the warehouse roof safety pressure relief valve, the pressure relief valve to open positions within the release pressure and prevent warehouse explosion accident.
5, by the level of material position can be observed in full and lack of material warehouse.
6, when the need to discharge, first open the manual discharge valve at the bottom of the cone, and then through the cement delivery device will cement transport out. In the discharge process, if there is "bagging" phenomenon, press the button on the timely broken arch device solenoid valves were blowing, eliminating the "bagging" in feeding, to ensure smooth supply of cement.
7, when the cement delivery device fails, first turn off the manual discharge valve at the bottom of the cone to prevent cement spills, resulting in waste.