• Lipp steel silo systemBAIRONG Lipp steel silo system - Best solution for the grain storage silo, cement storage silo and water treatment system
  • Bulk bolted storage silo systemBAIRONG Bolt bulk storage silo system - Best solution of the bulk grain storage, bulk cement storage system
  • Lipp silo forming machineBAIRONG Lipp silo forming machine, Best solution for the lipp silo making machine, spiral steel silo making equipment
  • 1
  • 2
  • 3
Tel: 86-18610 0838 68
Fax: 86-371-6871 6761
Email:tanjie@spiral-silo.com
         kingreal2004@gmail.com
Address: NO1, Renmin Road, Anyang City 455000, Henan Province, China PR

HOME >> NEWS >> Proposal for Fly Ash Storage Silo Clean

fly ash storage silo

Fly ash storage silo clear the reservoir construction program 11

1, in the range of cement silo clean installation of temporary library construction warning signs, construction may not exceed the specified range for construction, prohibit access to the construction site.

2, closed library materials storage pipeline and tie securely with wire, hang warning signs.

3, the top of the manhole from the library to observe the situation firmly library stockyard situation and library ladder, confirmed safe before entering.

4, library lighting from the library included in the top middle of the hole into the material level, cleaning personnel shall not contact lighting tools and lines.

5, homogenizing library materials have serious knot barrel wall phenomenon. Now need to clean up, which would be at the top of your library 5cm square tube Yanbian open a small mouth, put a safety rope to the inside and outside the library rope tied securely position the rope climb as construction workers remove homogenizing silo wall material safety rope, climbing construction personnel department with specific tools and safety rope climb phase, safety gradual top-down clear tube wall material.

6, into the homogenizing silo library cleanup, the number of libraries and library outside is greater than the proportion of 1: 1, the external should assign someone to be monitoring. Qing blocking process, the company's reservoir bottom inspection personnel must keep plugging in the library next to the clear No. fan control cabinet, in order to promptly stop the air pressure machine, to prevent the library material ejected the workers buried or suffocation. Project Manager: Tao Xiaobin

7, into the library construction workers labor to Wear protective equipment, including goggles, dust masks, safety shoes, helmets and other safety rope.

8, when the officers entered the library, to the Department of the two safety rope, a fixed bracket on the outside of the library precipitator, climb a ladder on a fixed library.

9, at the beginning of the Qing library, see traffic conditions, under the feed spout; If the flow is too small, check the mouth of the funnel is blocked as a result of the library board caking material feed opening blocked, broken or clear compaction should be expected, under clear discharge port, to keep them open, down to the library or by direct loading feed trough to the designated location.

10, library databases for serious work to be fastened before the safety rope to ensure the safety of the operation before the end of the first in the library with an iron bar, hollow tube, compressed air poke material; then stir in the library roof were blown with compressed air; feed after the library first with compressed air, sticks to poke the material, the last available shovels, picks, etc., at the beginning of people far away from the material, beware of tread material.

11, for the library put on airs, such as high-altitude construction operations should strictly abide by the relevant provisions of aerial work. 

 


Copyright © 2010-2015 Zhengzhou Bairong Machinery CO., Ltd All rights reserved.
Address: NO1, Renmin Road, Anyang City 455000, Henan Province, China PR
Email: tanjie@spiral-silo.com kingreal2004@gmail.com
Tel:86-1861 0083 868